First Gold Pour, November 2020 Plant Mill, November 2020 Group Team Photo, November 2020 Richard Gray, CEO, November 2020 Plant Electrical Installation Underway, November 2020 Fieldwork Season On-going, October 2020 Gearbox Levels Checks Prior to Commissioning, October 2020 Ore Material Ready for Processing, September 2020 Processing Plant Roof Completed, September 2020 Plant Construction, September 2020 T1D Boomer Delivered, September 2020 Plant construction, September 2020 Plant construction, September 2020 Plant construction, August 2020 Cononish Glen, August 2020 Plant equipment taking shape, August 2020 Second Scoop Tram arrives, August 2020 Mill being installed, August 2020 Plant construction, August 2020 Plant construction, July 2020 Arial view of Plant construction, July 2020 First of seven slab pours ready, July 2020 Crom Allt bridge open and equipment mobilising, October 2019 Crom Allt Bridge Construction, October 2019 Crom Allt Bridge Construction, Sept 2019 Crom Allt Bridge Construction, Sept 2019 Crom Allt Bridge Construction, Sept 19 Crom Allt Bridge Construction, Sept 2019 Plant Machinery Ready to Transport, 2019 Mine crew, drill rig training, February 2020 Processing plant equipment being packed for shipment Ball mill ready to ship. Jaw crusher being packed for shipment. Drill rig in action, February 2020 Mining crews, February 2020 Drill rig in action, February 2020 Mining Team installing roof bolts. Geology Fieldwork Sampling, December, 2019 Geologist out in the field, July 2020 Mucking out following a blast. Locally manufactured structural steel ready for Plant construction, February 2020, Mining Team drilling blast holes. Drill rig at work. Drill Rig in Operation, 2019 LHD/ Scooptram at mine entrance. Drill Rig in Operation. Cononish Mine Adit, 2019. Cononish mine portal. Dux Underground truck. Hydrema haul truck. Case Front end loader and excavator. View of Cononish Mine, 2019 Winter Sunset Cononish, Dec 2018 Near mine exploration Drone DEM Survey, 2019. Drone DEM survey. Soil sampling at Beinn Udlaidh, August 2019. Argo ATV at Beinn Udlaidh summit. Fieldwork at Beinn Udlaidh, August 2019. Fieldwork at Beinn Udlaidh, August 2019. Scotgold geologists and CSM masters students in the field, July 2019 Geologist logging core, April 2019 SEG visit to Cononish, August 2019 SEG visit to Cononish, August 2019 Calum Lyell Presenting at the SGA conference, August 2019 Scotgold Display at Huntarian Museum, August 2019 Water Sampling, Cononish, 2018 Geologist stream sediment sampling, Cononish 2018 Stream sediment sampling, Glen Orchy 2018